SYS Electromac makes table, pedestal, wall and ventilation fans under your brand for importers and distributors in Ghana.
India’s fan exports to Ghana, FY 2025-26: US$1.78 million in total, of which US$1.72 million ceiling fans and US$0.02 million table, pedestal and wall fans (DGCI&S TradeStat, HS 8414.51).
Where Indian fans stand in Ghana
Ghana already imports Indian ceiling fans in volume. Adding our table, pedestal, wall and ventilation range lets one Indian supplier cover the whole fan shelf, in one container and on one set of documents.
West Africa through Tema
Tema also serves landlocked Burkina Faso and Mali. Specify the final market for each lot.
Supply, plug and conformity
| Supply | 230 V / 50 Hz |
| Plug | BS 1363 and round-pin are both in use |
| Ports | Tema, Takoradi |
| Conformity | Regulated electrical goods are checked by the Ghana Standards Authority. We supply the test reports and production records it asks for. |
| Terms | Advance or LC; FOB or CIF |
Ceiling fans in the same container
We do not manufacture ceiling fans, but we work with reputed ceiling fan manufacturers. You can buy ceiling fans on our invoice alongside your table, pedestal, wall and ventilation fans, or we introduce you and you contract with the manufacturer directly. Ceiling fans are made and certified by the partner manufacturer under its own licence.
How an export order runs
- RFQ: model, quantity, market, plug, packing and target date.
- Sample: available for a small fee, with a 7-day lead time on existing models.
- Market specification: labels, cord, packing and documents signed off in writing.
- N-10 pilot lot for your approval before mass production.
- Production: three weeks on existing models, on the same three conveyorized lines that build 150,000 fans per month.
- Pre-dispatch inspection by you or your agent in our four PDI cabins.
- Loading and dispatch, FOB or CIF.
Payment is by advance or letter of credit. The minimum order is 500 pieces per model, and one container can carry several models. See the export overview, the Africa page, private-label manufacturing and our factory tour.
Request an export quotation
Request a quote
Tell us what you need and we will come back with pricing, lead time and a sample plan. Minimum order from 500 pieces. Three-week lead time on existing models.